Everett Dirkson Building - Washington, D.C.
The building was constructed by Baltimore Contractors.
ARMM was engaged to design waterproofing and dampproofing surfaces
for the entirety of the building. Mr. Ernie Kopiecky, Site Administrator,
was a GSA specialist for the project.

ARMM's involvement was the preliminary design
and installation monitoring of all dampproofing and waterproofing
services. ARMM's responsibilities included reviewing the documents
provided by the resident architect and the entire project had been
placed in the fast-track mode.
ARMM produced value engineering for all documents and with their
review, submitted a resubmission to GSA for possible corrections
and financial deletions. After a complete review and redrafting
of details, ARMM resubmitted all documents to GSA. Additional documents
were returned to Baltimore Contractors for changes within the structure.
ARMM addressed the roofing concerns, vertical expansion joints,
plaza waterproofing, internal planters, below grade waterproofing
and internal flashings.
The Phased Project continued for three years.
|